Make the Schedule - an overview

Scheduling for one day is the process of adding shifts, assigning employees, and publishing the day.

4 Basic Steps for Making the Weekly Schedule:

  1. Add shifts (position and time) on the day:  Use a template, Draw Mode (the pencil icon above the positions), or Add Shifts.
  2. Fill each shift with the right employee:  Press the Smart Scheduling button on the top left of the scheduling page, next to Add Shifts.
  3. Repeat this process for each day.  To go between days, simply click on the next day in the row of days at the top of the page.  The arrows on either side of the days take you to the previous or next week.
  4. Publish the schedule:  One day at a time or wait and publish the whole week at once.

Common additional steps:

  • Make a Template?  After you add shifts to the first day, you can make a template of the day so that you can repeat the pattern over and over.
  • Need projections?  You can Set Projections for the week prior to scheduling.  (Optional)
  • Review the schedule before you publish (check for for conflicts)

The top of the scheduling page: Set Projections, Apply a Template, Add Shifts, Smart Scheduling and Copy Week on the left, the row of days between the week arrows, and the pencil icon for Draw Mode above the positions

The bottom of the scheduling page: New Template, Review Week and PUBLISH NOW with DAY and WEEK

Still need help? Contact Us Contact Us